A technically demanding commission, the facility was upgraded to meet the modern safety and functional standards essential to critical medical testing. We executed a full strip-out and installed laboratory-grade flooring, wall, and ceiling systems, upgrading electrical and plumbing networks to laboratory specification.
High-level HVAC filtration, contemporary fire-protection systems, and finishes tailored to chemical-handling zones were integrated under stringent quality control. The completed laboratory offers a safe, compliant, and clinically robust environment for sensitive diagnostic operations.